Project Manager's Master Check List |
3/12/1996 |
|
MDOT Project Planning and Scheduling Seminar |
6/5/1996 |
|
Your Role in Mentoring and Coaching |
11/12/1996 |
|
Book A Introductions, Random Subjects to Start Writing |
8/9/2001 |
|
Draft #1 for Book A Introductions |
7/15/2002 |
|
Construction University, A series of essays for the construction professionals |
9/10/2001 |
|
Program Management Seminar Subject List |
8/7/2001 |
|
Effective Project Management for Building Design and Construction |
1/8/2001 |
|
Effective Construction Contract and Field Administration |
3/12/2001 |
|
Sharpening Project Management Skills for the 21st Century |
11/13/1999 |
|
Critical Path Method Seminar |
1/29/1992 |
|
Total Quality Project Management - Fulfilling the Demands Placed on Today's Project Manager |
5/13/1993 |
|
Critical Path Method Seminar |
2/26/1992 |
|
Critical Path Planning Seminar |
6/2/1993 |
|
Project Management and Partnering Seminar |
5/27/1999 |
|
Partnering for the Design and Construction Profession |
7/1/1999 |
|
Michigan Millers Mutual Insurance Addition & Renovation Partnering Charter |
8/18/1992 |
|
Frankenmuth Mutual Insurance Partnering Charter |
1/28/1993 |
|
West Suburban Health Campus Partnering Charter |
3/7/1993 |
|
Developing Successful "Partnering" Relationships for Design and Construction - Unedited Notes |
11/3/1993 |
|
Fizhugh Retention Basin Project Partnering Charter |
8/16/1993 |
|
Muskegon Community College - Center for Higher Education Partnering Charter Work Book |
7/23/1996 |
|
How CPM cuts construction time and money |
6/1/1964 |
|
Effective Construction Contract and Field Administration |
3/13/1995 |
|
The Importance of Strategic Planning for Contractors |
12/4/1992 |
|
Developing Successful "Partnering" Relationships for Design and Construction Projects |
11/1/1995 |
|
Notes from Partnering Charter Session #2 - VA Medical Center, Ann Arbor, Michigan |
5/2/1997 |
|
Effective Project Management for Building Design and Construction |
1/9/1995 |
|
Partnering: Problems, Challenges, How-To's |
11/13/1992 |
|
Partnering Reference Notes |
2/4/1993 |
|
The Business Model Notes |
2/17/1995 |
|
Michigan AGC Constructor Development Seminar |
5/20/1999 |
|
The Importance of Strategic Planning |
12/4/1992 |
|
Partnering Charter Work Book - Psychiatric Rehabilitation Center |
8/15/1995 |
|
Partnering Charter Work Book - Clinical Addition and Renovation, Veterans Administration |
6/28/1995 |
|
Iterative Estimating Notes |
7/22/1987 |
|
Retentions, Collections, and Final Payment |
2/14/1987 |
|
Conflict & Turmoil in the Engineering Profession |
4/3/1986 |
|
Retentions, Collections, and Final Payment |
4/16/1986 |
|
Critical Path Modeling: University Planning in an Urban Context |
7/1/1983 |
|
Construction Partnering Charter Work Book - La Crosse Urban Street Improvements |
5/28/1997 |
|
Partnering Charter Work Book and Notes - MIT Chemistry Building Renovation |
1/30/2001 |
|
Construction Liability Interview Notes |
undated |
|
WWD Project Feasibility Study |
1/1/1980 |
|
Design of an Underground Parking Structure |
undated |
|
CPM Seminar |
10/3/1986 |
|
Scheduling for Dollars Seminar |
9/20/1978 |
|
Site Location Study - Detroit, Michigan |
7/26/1970 |
|
PHI Project Management Seminar |
3/20/1996 |
|
Handout Master Notebook HO 1-254 |
undated |
|
City of Flint Downtown Improvement Program Monitoring Reports 1-7 |
8/13/1975 |
|
City of Flint Downtown Improvement Program Monitoring Reports 8-25 |
1/5/1976 |
|
City of Flint Downtown Improvement Program Monitoring Reports 26-45 |
1/20/1977 |
|
City of Flint Downtown Improvement Program Monitoring Reports 46-63 |
1/5/1978 |
|
City of Flint Downtown Improvement Program Monitoring Reports 64-82 |
1/12/1979 |
|
City of Flint Downtown Improvement Program Monitoring Reports 83-101 |
1/10/1980 |
|
City of Flint Downtown Improvement Program Monitoring Reports 102-125 |
1/8/1981 |
|
City of Flint Downtown Improvement Program Monitoring Reports 126-147 |
1/7/1982 |
|
City of Flint Downtown Improvement Program Monitoring Reports 148-170 |
1/7/1983 |
|
City of Flint Downtown Improvement Program Monitoring Reports 171-193 |
1/6/1984 |
|
City of Flint Downtown Improvement Program Monitoring Reports 194-211 |
1/15/1985 |
|
City of Flint Downtown Improvement Program Monitoring Reports 212-225 |
1/21/1986 |
|
City of Flint Downtown Improvement Program Monitoring Reports 226-238 |
1/12/1987 |
|
City of Flint Downtown Improvement Program Monitoring Reports 239-242 |
4/7/1988 |
|
City of Flint Systems Monitoring Reports 1-9 |
1/7/1983 |
|
Flint River Flood Control Project Monitoring Reports 1-10 |
10/17/1972 |
|
Genesee Recreation Area Monitoring Reports 1-5 |
5/15/1975 |
|
Genesee County Jail Monitoring Reports 1-15 |
12/23/1985 |
|
Burgess-Norton Manufacturing SatelliteMP Monitoring Reports 1-9 |
7/24/1974 |
|
Scott Regional Facility Contract A Monitoring Reports 1-25 |
6/22/1984 |
|
Scott Regional Facility Contract B Monitoring Reports 1-22 |
6/22/1984 |
|
Scott Regional Facility Contract C Monitoring Reports 1-24 |
7/9/1984 |
|
Scott Regional Facility Contract C-2 and C-3 Monitoring Reports 1-16 |
10/24/1984 |
|
Hennepin County Medical Center Move-In Monitoring Reports 1-4 |
4/3/1975 |
|
New International Terminal Monitoring Reports 1-4 (Design) Monitoring Reports 1-11 (Construction) |
4/17/1972 |
|
Business Model for RA Associates |
4/1/1971 |
|
Kalamazoo 1977 Planning Reports 1 to 7 |
9/1/1977 |
|
Strand Project Management Report |
9/7/1982 |
|
Design-Build Seminar for Butler Building - UK |
undated |
|
Radisson Hotel at Seven Corners Monitoring Reports |
7/26/1983 |
|
Energy 80's Project Monitoring Reports |
12/22/1980 |
|
Terra Haute industries Breed Plant Monitoring Reports |
4/27/1981 |
|
Zale Corporation World Headquarters Monitoring Reports |
6/1/1981 |
|
Network Planning and Critical Path Method in the Design and Construction Profession |
10/13/1979 |
|
State of Michigan Office Building Monitoring Reports |
2/10/1981 |
|
Burroughs Home Office Facility Remodeling Monitoring Reports |
7/3/1969 |
|
Manufacturers Bank Operation Center Construction Monitoring Reports |
11/7/1986 |
|
Manufacturers Bank Operation Center Monitoring Reports |
12/20/1985 |
|
Opus Airport Hilton Hotel Monitoring Reports |
4/29/1986 |
|
Weights and Values as a Decision Making Tool |
1/1/1989 |
|
Author's Questionnaire and Index Partnering Book |
7/14/1995 |
|
Chrysler Project Management Solicitation |
8/18/1978 |
|
NSPE Annual Meeting Presentation Information |
7/29/2000 |
|
Abstract of Paper on Corridor Analysis and the Construction Profession |
11/1/1983 |
|
Project Management and Trends in Project Delivery |
1/25/2002 |
|
Project Management Seminar |
1/17/2002 |
|
Design/Build Seminar Proposal |
7/24/1975 |
|
Seminar Proposed Project Case Study |
undated |
|
Summary Report for New Chrysler Engineering Center |
1/7/1958 |
|
Correspondence Regarding Involvement in the Downtown Development of Flint |
10/16/1978 |
|
Promotional Trip Report for Victor Gruen Associates |
11/11/1957 |
|
Ideas and Principles to Help the Design and Construction Professional Have Fun and Be Profitable |
1/31/2002 |
|
Inspection of Fire Damage at Franklin Simon Store |
3/4/1975 |
|
Marshall University Claims Case |
12/4/1982 |
|
Proposal for Instituting a Partnering System on a New Project |
12/27/1993 |
|
Partnering Charter Work Book NBD Suburban Office Complex |
4/6/1995 |
|
Project Management Definitions |
6/16/1993 |
|
Superintendents' Management Institute Project Management Seminar |
12/5/1977 |
|
The Role of the Estimate and The Proposal |
8/1/1997 |
|
Construction Charter Partnering Work Book - University of Michigan Professional Studies Classroom |
10/15/1999 |
|
National Electrical Contractors Association Project Management Seminar |
undated |
|
Consultation with Tuttle White Constructors re: Project Planning, Monitoring and Control Systems |
6/20/1978 |
|
Chrysler Engineering Division Function and Communication Analysis |
12/10/1957 |
|
Kohler Construction Claim Avoidance Seminar |
1/31/1989 |
|
Grace Hospital Remodeling Monitoring Reports |
12/22/1976 |
|
International Builders Exchange Executives Workshop Suggestions |
1/19/1997 |
|
J.C. Penney Southland Mall Monitoring Reports |
3/31/1975 |
|
J.C. Penney Westland Mall Monitoring Reports |
3/31/1975 |
|
K-Mart Fairview Heights, Illinois Monitoring Reports |
2/26/1975 |
|
K-Mart Manchester, Missouri Monitoring Reports |
5/30/1975 |
|
K-Mart Olathe, Kansas Monitoring Reports |
11/19/1975 |
|
Master Coordination and Control Program for Downtown Flint Area Development |
5/8/1975 |
|
Murphy Elementary School Monitoring Reports |
3/14/1975 |
|
Riverview Office Financial Study |
2/1/1975 |
|
Project Partnering Charter Revisited - V.A. Hospital -Ann Arbor, Michigan |
5/6/1997 |
|
Witcher Construction Company Business Operating Plan for FY 2000-2001 |
undated |
|
Best Practices Handbook |
1/23/2003 |
|
Swimming with the Sharks in Construction |
2/9/1991 |
|
Construction Planning and Control Program for ICL Truck Terminal |
5/21/1975 |
|
Project Team Charter from Various Projects |
10/19/1999 |
|
Monitoring and Schedule Review of Madison Square Office Building |
7/2/1984 |
|
Standing Neutral 2 Work Book |
7/23/1987 |
|
Alternative Dispute Resolution for the Design and Construction Professional |
11/8/1997 |
|
The Registry Hotel Monitoring Reports |
5/12/1975 |
|
Hurley Hospital Auditorium Building Monitoring Reports |
4/21/1975 |
|
Sorensen Gross Management Conference Material |
9/8/1991 |
|
Monitoring Reports for Hennepin County Center Hospital |
2/10/1975 |
|
Monitoring Reports for K-Mart Beaver Dam, Wisconsin |
5/29/1975 |
|
Monitoring Reports for Dort Community School Project |
4/30/1975 |
|
Monitoring Reports for Metropolitan Waste Water Treatment Plant Primary Settling Tanks |
2/3/1975 |
|
Monitoring Reports for K-Mart Monroe, Wisconsin |
6/3/1975 |
|
Citizen Participation |
4/30/1957 |
|
Panel Discussion on Ethics |
1/15/1958 |
|
How to Select a Planner for the Business Community |
undated |
|
Revitalization of our C.B.D.s (Central Business Districts) |
5/23/1957 |
|
Future Kalamazoo Presentation Speech |
3/18/1958 |
|
Cost accounting System for Maisal/Malan Organizations Monitoring Reports |
5/9/1975 |
|
Kalamazoo Justice Center Recommendations and Report |
12/21/1994 |
|
Management and Trends in Project Delivery Systems for the Design and Construction Professional |
1/17/2002 |
|
Leadership and Ethics |
5/1/1994 |
|
Developing Successful "Partnering" Relationships for Design and Construction Projects |
10/30/1996 |
|
Exploring Successful Application of "Partnering" in the Construction Industry |
11/19/1992 |
|
Effective Project Management for Building Design and Construction |
2/11/1991 |
|
Project Management and Claims Avoidance Seminar |
3/16/1984 |
|
Design and Construction Department Customer Focused Scheduling and Partnering Conference |
6/10/1997 |
|
Loss Prevention Convocation |
11/12/1992 |
|
Education and Training in the Construction Industry; Foundations for Our Future |
5/27/1993 |
|
"Tales From the Front" : A Brief Overview of Design-Construction Disputes |
4/19/1993 |
|
Michigan Society of Professional Michigan Alternate Dispute Resolution Handouts |
11/28/1993 |
|
Alternative Dispute Resolution Presentation |
10/14/1992 |
|
Creative Career Opportunities by Developing Key Contacts |
5/21/1992 |
|
Networking - Now & Beyond |
6/29/1994 |
|
Construction Project Delivery Systems |
2/7/1990 |
|
The Vital Center - University Planning in an Urban Context |
8/2/1982 |
|
CAM Magazine Interview Regarding Alternate Dispute Resolution |
8/1/1994 |
|
"Partnering" |
2/17/1994 |
|
The Structural Engineer, the Architect, Dispute Resolution & Partnering |
2/3/1993 |
|
What is Partnering |
5/5/1994 |
|
Michigan Quality Initiative - Alternative Dispute Resolution & Partnering |
12/13/1993 |
|
Helping Our Nation Get More Quality Planning & Construction for the Money |
11/14/1984 |
|
Creating Career Opportunities by Developing Key Contacts |
5/21/1992 |
|
Exploratory Land Use Study for The Burdick Arcade Company |
12/7/1952 |
|
Business Strategy Conference |
12/16/1997 |
|
AGC of Michigan Student Contractor Awareness Night Ethics Discussion |
10/11/2000 |
|
Rosza Center for the Performing Arts |
4/26/1999 |
|
Replacement Hospital V.A. Medical Center Original and Revisiting Partnering Papers |
4/23/1992 |
|
Applying and Implementing Partnering Systems |
7/29/2000 |
|
Office Field Communications |
12/5/1996 |
|
T.B. Simon Power Plant Unit #4 Addition Monitoring Reports and Notes |
4/6/1991 |
|
Soaring Eagle Resort Monitoring Reports and Notes |
11/27/1995 |
|
Cargill Office Building Monitoring Reports and Notes |
1/15/1976 |
|
Metropolitan Waste Water Treatment Plant Monitoring Reports and Notes |
1/15/1975 |
|
Municipal Office Center Monitoring Reports |
7/30/1975 |
|
Monitoring Reports for K-Mart Independence, Kansas |
7/29/1975 |
|
Monitoring Reports for K-Mart Arkansas, Kansas |
7/24/1975 |
|
Monitoring Reports for K-Mart Emporia, Kansas |
7/24/1975 |
|
Monitoring Reports for Physical Education Building |
8/21/1975 |
|
Monitoring Reports for K-Mart Maplewood, Missouri |
9/19/1975 |
|
Monitoring Reports for Cargill Lake Office Link |
9/30/1975 |
|
Monitoring Reports for Cargill Parking Ramp |
12/3/1975 |
|
Monitoring Reports for K-Mart Garden City, Kansas |
4/28/1976 |
|
Monitoring Reports for K-Mart Hayes, Kansas (masonry) |
4/28/1976 |
|
Monitoring Reports for Sludge Thickener Facility |
6/17/1976 |
|
Monitoring Reports for K-Mart Wichita, Kansas |
6/1/1976 |
|
Monitoring Reports for Hurley Hospital New Utility Building |
11/11/1975 |
|
Monitoring Reports for K-Mart Jacksonville, Illinois |
12/29/1975 |
|
Monitoring Reports for Ann Arbor Waste Treatment Plant |
12/5/1978 |
|
Monitoring Reports for Phase One, Hurley Hospital |
6/5/1973 |
|
Monitoring Reports for Phase One Stage Two, Hurley Hospital |
8/6/1974 |
|
Monitoring Reports for K-Mart New Lenox, Illinois |
10/8/1976 |
|
Redstone Masonry Article - Planning and Scheduling Masonry Construction |
12/8/1981 |
|
Monitoring Reports for St. Lawrence Hospital Project |
9/1/1976 |
|
Monitoring Reports for Minnesota Life Insurance Company |
6/22/1976 |
|
Monitoring Reports for Kroger Store - Olathe, Kansas |
6/2/1976 |
|
Monitoring Reports for Family Health Care Center Addition |
6/10/1976 |
|
Monitoring Reports for Apartment Complex - King Faisal Medical City |
6/18/1976 |
|
Monitoring Reports for Manufacturers Bank Renaissance Facilities |
3/3/1976 |
|
Monitoring Reports for Expansion and Remodeling of Concourse E at Detroit Metropolitan Airport |
2/13/1975 |
|
Monitoring Reports for Physical Education Building - Lansing Community College |
12/23/1974 |
|
Procurement Matrix |
12/27/1995 |
|
Project Management Primer |
11/17/1995 |
|
T.B. Simon Power Plant Unit #4 Addition Scheduling Notes |
3/26/1992 |
|
T.B. Simon Power Plant Unit #4 Addition Start-Up Notes |
12/23/1992 |
|
Network Model for Harrington Renovation Program |
8/30/2000 |
|
Notes on Planning and Consulting Services for Saginaw Chippewa Indian Tribe Entertainment Center |
1/27/1994 |
|
Notes on Michigan Capitol Restoration Program |
9/27/1996 |
|
ConAgra Corporate Campus Scheduling Notes and Network Models |
11/29/1988 |
|
Monitoring Reports for Horticultural Demonstration Gardens |
3/19/1991 |
|
Monitoring Reports for Minneapolis Convention Center Hotel and Garage |
4/16/1991 |
|
System Control Western Michigan IM-240 Network Models |
8/15/1994 |
|
Michigan AIA Annual Convention Project Delivery System Notebook |
4/6/2000 |
|
Monitoring Reports for Mott Durham Pool Renovation |
7/2/1991 |
|
Albert Kahn Associates Critical Path Planning and Scheduling Workbook |
1/26/1996 |
|
Monitoring Reports for Robinson Middle Schools |
12/16/1974 |
|
GSA PBS Debriefing Handouts |
2/11/1991 |
|
Monitoring Reports for National Life Insurance Building |
5/22/1978 |
|
Monitoring Reports for Senior Citizen Housing |
8/17/1977 |
|
Monitoring Reports for Schickler Elementary School |
10/7/1974 |
|
Monitoring Reports for Chrysler Corporation Proving Ground |
1/13/1978 |
|
Monitoring Reports for Bi-County Community Hospital East Wing Addition |
11/20/1974 |
|
Monitoring Reports for Manufacturers Bank Renaissance Facilities - Retail Space |
6/9/1976 |
|
Preliminary Description of Functions to be Housed at Livonia Facility |
9/1/1981 |
|
Selected Essays on Using Partnering to Improve Performance Session Material |
12/1/1995 |
|
Monitoring Reports for Detroit Water and Sewage Department Development Program |
8/6/1976 |
|
Witcher Retreat Decision material |
2/17/1988 |
|
Michigan Constructor: Planning a Construction Career article |
12/1/1996 |
|
Monitoring Reports for Lawrence Institute of Technology: Business and Management Building |
5/4/1981 |
|
Monitoring Reports for Northern Town Center |
8/10/1990 |
|
Monitoring Reports for Metropolitan Airport: New International Terminal Construction Phase A |
6/22/1972 |
|
Monitoring Reports for Metropolitan Airport: New International Terminal Construction Phase B |
10/26/1972 |
|
Network Planning: New Management Tool article |
5/1/1963 |
|
Constructing Louisiana: Closing Out a Construction Project article |
4/15/2002 |
|
Site Location Study - Lansing, Michigan |
2/12/1970 |
|
Site Location Study - Grand Rapids, Michigan |
4/6/1970 |
|
Business Plan and Family Business Succession Planning notes |
5/12/1995 |
|
Northwest Airlines Aircraft Maintenance Facility Construction Schedule |
11/5/1995 |
|
MRCS River Seepage |
8/1/1994 |
|
North St. Paul School Expansion Program notes and schedules |
4/3/1995 |
|
Arboretum Project |
2/21/1996 |
|
U.S. 23 Design, Build, & Warrant - Reconstruction of 6.1 miles |
4/30/1996 |
|
Business and Technical Consulting Detailed Report |
1/3/1975 |
|
General Business Consulting Final Report |
5/28/1974 |
|
Ensuring the Future of the Construction Industry Speech |
4/29/1996 |
|
Facilities Planning Construction Maintenance and Operations Study |
10/8/1971 |
|
Kalamazoo Differential Sedimentation and Elutriation Ash Handling System report |
4/11/1995 |
|
University of Iowa: Medical Education & Biomedical Research Facility Notes and Schedule |
3/19/1999 |
|
Monitoring Reports for Metropolitan Waste Water Treatment Plant |
1/8/1975 |
|
Monitoring Reports for Eden Prairie Minnesota School Expansion |
5/23/1978 |
|
Monitoring Reports for Highland Campus, Mechanical and Electrical Renovation Work |
7/27/1972 |
|
Smith Village Street Resurfacing project notes |
8/23/2000 |
|
Little Six Bingo/Casino Project Notes |
4/30/1991 |
|
Monitoring Reports for Van Dyke School District Renovation Program |
4/15/1991 |
|
Macy's at The Mall of America Project Notes |
5/1/1991 |
|
Metropolitan Airport Commission Ground Transportation Center Project Material |
7/8/1991 |
|
Monitoring Reports for Grand Traverse Resort Village Conference Center |
8/6/1986 |
|
The Grand Casino of Hinckley Notes and Schedules |
8/27/1991 |
|
Monitoring Reports for Symphony Place Apartments |
3/12/1982 |
|
Monitoring Reports for Genesee County Government Center |
2/15/1968 |
|
Monitoring Reports for Catholic Central High School |
4/28/1969 |
|
Monitoring Reports for Cargill Burns Harbor Elevator |
6/18/1979 |
|
Monitoring Reports for Cargill Council Bluffs Elevator Expansion |
6/1/1981 |
|
Monitoring Reports for Riverside Osteopathic Hospital |
9/23/1979 |
|
Monitoring Reports for Sludge Disposal Building |
5/27/1981 |
|
Monitoring Reports for Additions and Alterations to Ingham Medical Center |
3/17/1981 |
|
Business Model Planning for Sam Bloom Plumbers, Inc. |
1/24/1981 |
|
Monitoring Reports for University of Michigan Professional Studies Classroom Building |
5/9/2000 |
|
Monitoring Reports for City of Flint Department of Public Works Water Plant #2 Rehabilitation |
9/29/1999 |
|
What is Happening to the Use of Technology in Construction Operations |
6/26/2000 |
|
How to be a Successful Manager of Projects |
3/4/1999 |
|
Reconstruction of Lodge Freeway at Cobo Hall Notes and Schedules |
7/16/1987 |
|
Monitoring Reports for Mott Community College South Lakes Campus |
5/6/1992 |
|
How to Know When Your Construction Job is a Success |
5/1/1963 |
|
MSU Power Plant #4 Start-Up Meeting Notes and Schedules |
8/24/1992 |
|
Project Delivery Work Phases, Professional Services, and Construction HO 361-363 |
1/1/1990 |
|
Development Stage and Actions to be Taken HO 322 |
2/21/1992 |
|
The Consultant in Industrial Development |
5/21/1963 |
|
00287 |
Missing due identified duplicate document |
undated |
Real Estate Development Network Models |
5/1/1998 |
|
Monitoring Reports for Utility Tunnel and Power House Project |
11/1/1976 |
|
Monitoring Reports for Minneapolis Star and Tribune Press Plant |
10/30/1985 |
|
Monitoring Reports for Ann Arbor Waste Treatment Plant |
12/5/1978 |
|
Monitoring Report for International Court Building |
2/18/1985 |
|
Monitoring Reports for C.S. Mott Community College Site Work Phase 2 Construction |
3/27/1992 |
|
Monitoring Reports for United States Justice Department Consent Decree |
10/21/1983 |
|
Monitoring Report for Jackson State Prison Health Care Unit |
3/23/1984 |
|
Methods of Managing Destructive Conflict in an Engineering Practice Speaker Notes |
3/3/1992 |
|
Monitoring Reports for Grand Traverse Resort Village Condominium Tower |
9/16/1984 |
|
Planning and Scheduling Reports for the Bloomfield Township Combine Sewer Overflow Project |
12/27/1995 |
|
Monitoring Reports for G.E. Financial Assurance Call Center |
5/4/1999 |
|
Monitoring Reports for Dental Hygiene and Drental Assisting Remodeling Program |
5/11/1993 |
|
Monitoring Reports for the Minneapolis Institute of Arts |
1/23/1997 |
|
Monitoring Report for the University of Michigan Classroom and Laboratory Building |
10/22/1986 |
|
Monitoring Reports for GM Warehousing and Distribution Facility |
7/15/1986 |
|
Monitoring Report for the University of Michigan David L. Eisler Center |
8/5/1977 |
|
Monitoring Report for C.S. Mott Community College Capital Improvement Program |
8/10/1987 |
|
Monitoring Reports for the C.S. Mott Community College, Gorman Building Renovation |
10/19/1993 |
|
Monitoring Reports for the C.S. Mott Community College, Mott Memorial Building Renovation |
6/29/1990 |
|
Horizon Woodbury Planning and Scheduling |
11/16/1991 |
|
Review of Current MDOT Program/Project Management System |
4/4/1999 |
|
Monitoring Reports for Kalamazoo Department of Utilities |
12/18/1992 |
|
Reducing the Cost of Government Services - Kalamazoo |
7/21/1995 |
|
Monitoring Reports for the 1993 Restoration Program |
12/16/1992 |
|
Speech on Jones Park Development - Appleton, Wisconsin |
1/21/1960 |
|
Citizen Participation in Urban Planning |
4/30/1957 |
|
Detroit Unlimited |
1/1/1955 |
|
The Engineer - A Public Servant |
2/21/1965 |
|
Speech to the Graduating Engineering Class of University of Miami |
3/1/1957 |
|
Monitoring Reports for Mott Facilities Maintenance Building Project |
7/3/1991 |
|
Preconstruction Development for the Lake Charles Memorial Hospital |
12/12/1991 |
|
Detroit Public Schools 1994 Bond Issue - Program Architect/Engineer Services Notes |
7/24/1996 |
|
Monitoring reports for First Colony Life Insurance Building Remodeling |
3/15/1992 |
|
Monitoring Reports for the East China Community Schools Bond Issue |
12/3/1989 |
|
Preconstruction Activities of Interest to Designers and Contractors |
12/8/1991 |
|
Monitoring Reports for Public Works Water Plant #2 Rehabilitation |
11/17/2000 |
|
City of Flint - Lake Huron Water Supply Program Notes |
5/6/1996 |
|
Monitoring Reports and Notes for University Park Program |
11/27/1992 |
|
Monitoring Reports for City of Flint - Improvement Program |
3/21/1989 |
|
Monitoring Reports for Flint Water Treatment and Distribution System Futures Analysis |
6/4/1984 |
|
Monitoring Report for Flint/Detroit Water Program |
5/27/1986 |
|
Miscellaneous City of Flint Downtown Improvement Program Correspondences |
10/3/1975 |
|
Kalamazoo Planning Program Reports |
9/3/1962 |
|
Downtown Kalamazoo Planning Program Reports |
3/18/1970 |
|
Committee Reports on the Ad Hoc Committee on Thoroughfare Planning |
10/14/1970 |
|
Kalamazoo 1980 |
1/1/1958 |
|
Presentation to Downtown Property's Owners' Association |
3/6/1957 |
|
Proposal for Downtown Area Shown articles |
3/19/1958 |
|
1980 Plan: Creative Renewal and Who's he? Articles |
1/1/1980 |
|
Kalamazoo Justice Center Report and Notes |
12/21/1994 |
|
Monitoring Reports for Kalamazoo Waster Water Reclamation Plant |
10/12/2001 |
|
Quality of Life material |
7/6/1996 |
|
How The Owner and User Can Improve Total Construction Project Performance Without Additional Cost |
5/1/1997 |
|
The Thinking Man's Consultant |
1/1/1996 |
|
Planning & Managing a Project and Ideas for Better Planning and Control articles |
1/1/1977 |
|
The Constructive Approach |
3/21/1994 |
|
Summary of Ralph J. Stephenson, P.E. as dictated to David B. Schock |
9/14/2004 |
|
Michigan Construction Industry Mourns Passing of Ralph Stephenson |
5/1/2006 |
|
The Construction Industry Loses an Exceptional Man |
4/15/2006 |
ID |
Drawing Title |
Sheets |
Ajax Paving - I-75 Work from Josyln to M-15 |
5 |
|
Cargill Incorporated - Burns Harbor Elevator |
18 |
|
City of Flint - Autoworld |
13 |
|
City of Flint - Beach Street Work |
1 |
|
City of Flint - Broadway Stever Improvements |
1 |
|
City of Flint - Buick City |
29 |
|
City of Flint - Carriage Town Project |
1 |
|
City of Flint - Doyle Housing |
3 |
|
City of Flint - Economic Adjustment Plan |
2 |
|
City of Flint - Energy Plan Preparation |
1 |
|
City of Flint - Flint Industrial Village |
4 |
|
City of Flint - Flint River Beautification |
9 |
|
City of Flint - North Commercial Project |
2 |
|
City of Flint - Oak Park Urban Renewal Plan |
4 |
|
City of Flint - Riverfront Center |
16 |
|
City of Flint - Sample Industrial Development |
1 |
|
City of Flint - Tax Increment Financing |
1 |
|
City of Flint - Union Street Work |
1 |
|
City of Flint - User Program |
2 |
|
City of Flint - User Work |
3 |
|
City of Flint - Water Street Market |
1 |
|
City of Flint - Water System Project |
2 |
|
City of Flint - Water Treatment Plant Forward Planning |
7 |
|
City of Flint - WWD Project |
8 |
|
City of Flint Downtown Improvement Plan |
39 |
|
City of Kalamazoo - Burdick Arcade |
11 |
|
City of Kalamazoo - Land Use Study |
2 |
|
City of Kalamazoo - Land Use |
2 |
|
City of Kalamazoo - Urban Renewal Plan |
3 |
|
City of Ypsilanti - Design - Permanent |
2 |
|
Detroit Metropolitan Airport Concourse E |
8 |
|
Detroit Water and Sewage Department |
46 |
|
GE Financial Assurance Call Center |
2 |
|
General Networking Instructions |
5 |
|
Grand Traverse Resort Village |
1 |
|
International Court - St. Paul |
4 |
|
JC Penney - Southland |
8 |
|
Kirk Program Management Development Schedule |
1 |
|
K-Mart D Series Operations Store 7178 - Madison, Wisconsin |
8 |
|
K-Mart D Series Operations Store 7193 - Springfield, Missouri |
8 |
|
MDOT Sample Project |
1 |
|
Mercy Hospital Additions & Alterations - Port Huron, Michigan |
14 |
|
Michigan State University - TB Simon Power Plant Unit 4 |
3 |
|
Symphony Place Apartments - Minneapolis, Minnesota |
5 |
|
Proposed Warehouse Facility Sample Project |
8 |
|
Seminar Sample Projects |
9 |
|
Soaring Eagle Casino - Mt. Pleasant, Michigan |
16 |
|
Strand Company - Building Program |
8 |
|
Strand Company - Processing Orders |
8 |
|
Terra Haute Industries - Breed Plant Precipitators |
6 |
|
Zale Corporation World Headquarters |
23 |
ID |
Video Title |
Minutes |
Michigan AGC Address |
70 |
|
AGC Total Quality Management Nightly News |
29 |
|
Managing Destructive Conflict |
36 |
|
The Partnering Concept |
105 |