A.
PART DATA / LINE UP INFO
|
CKD
|
|
1.
Has the job folder been Created?
|
|
|
2.
Have part edits been reviewed?
|
|
|
3.
Kick off notes reviewed?
|
|
|
4.
Has the customer specs been reviewed?
|
|
|
5.
Has die draw been supplied by the customer or determined by the
designer?
|
|
|
6.
Has draft analysis been run with
minimum draft established?
|
|
|
7.
Is draft analysis copy included with folder and checklist?
|
|
|
8.
Has the part been completely reviewed for molding?
|
|
|
9.
Is part data complete?
ISM & OSM?
|
|
|
10. Are
part changes required? If so,
are sketches attached?
|
|
|
11. Do
all ribs have adequate draft?
|
|
|
12. Are
ribs too thick at the base? (40%
- 50% Max.)?
|
|
|
13. Do
bosses have adequate draft? (Min.
0.5°
on O.D. & I.D.) ?
|
|
|
14 What
is the shrink factor?
|
|
|
15.
Are parts identical?
Mirrored
or rotated?
|
|
B. RUNOFF
|
|
|
1.
Has the parting line been completely defined?
|
|
|
2.
Is relief shown?
|
|
|
3.
Are vents shown?
With a blow up detail of vent on the sheet the vents are on?
|
|
|
4.
Is runoff complete?
|
|
|
5.
Do mold locks have counter locks?
|
|
|
6.
Are all locks on 10°?
|
|
|
7.
Is shutoff shown on correct half of mold?
|
|
|
8.
Can the return pins fit into shutoff?
|
|
|
9.
Is there shutoff around drops and runners (Min. 1.00)?
|
|
|
10. Is
there clearance in the core for hot drop expansion? (Wafer if possible)?
|
|
C. GATING
|
|
|
1.
Have gate and drop locations been supplied or determined?
|
|
|
2. Are
gates balanced and shown complete?
|
|
|
3. Are
all runner sizes and locations shown?
|
|
|
4.
Are gates shown in a 4X size view?
|
|
|
5.
Is a manifold or sprue required?
|
|
|
6.
Are cashew inserts and screws designed if required?
|
|
D. MOLD SIZE
|
|
|
1.
Does mold fit into customer’s press?
|
|
|
2.
Do parts clear tie bars?
|
|
|
3.
Is part completely de-molded?
|
|
|
4.
Are stack up dimensions and high point shown with overall block
sizes called out?
|
|
|
5.
Is “O” corner shown?
|
|
|
6.
Does mold fit min. and max. shut height?
|
|
|
7.
Is top of mold and operator’s side called out?
|
|
|
8. Will design function in
press?
|
|
|
9.
Are eyebolts / clamp slots shown?
|
|
|
10. Eyebolts
to correct size?
|
|
|
11. Eyebolt
sheets filled out?
|
|
|
12. Eyebolts
designed in all loose pieces weighing in excess of
40 pounds?
|
|
|
13. Has
0,0 been set to CL of Core?
|
|
E. Lifters
|
Chk’d
|
|
1.
How many lifters?
|
|
|
2.
Do lifters travel without any interference?
|
|
|
3.
Are lifter pocket covers surfaced and on the correct
layers?
|
|
|
4.
Are all fillets correct size?
|
|
|
5.
Are the layers all correct?
|
|
|
6.
Are all
lifters written out individually, labeled, and named properly?
|
|
|
7.
Do lifters & labels match design file?
|
|
|
8.
Is edm required?
|
|
|
9.
Are block-ups complete with sizes and setups?
|
|
|
10. Are lifter rod pinning requirements
on block-up sheets for
straight up lifters?
|
|
|
11. Are
rib cuts required and complete?
|
|
|
12. Have
designs been compared for lifter material?
|
|
F. SLIDES & CORE PULLS
|
CKD
|
|
1.
How many slides?
|
|
|
2.
Do slides have sufficient room to travel in slide pocket?
|
|
|
3.
Do slides have 5 or 3 lead in?
|
|
|
4.
Are slide wear plate pockets surfaced?
|
|
|
5.
Are all fillets correct size?
|
|
|
6.
Are the layers all correct?
|
|
|
7.
Are all
slides written out individually, labeled, and named properly?
|
|
|
8.
Do slides and labels match design file?
|
|
|
9.
Is edm required?
|
|
|
10. Are
block-ups complete with sizes and setups?
|
|
|
11. Are
core-pull block-ups required and complete?
|
|
|
12. Are
screw locations required and incorporated into surface file?
|
|
|
13. Are
rib cuts required and complete?
|
|
|
14. Have
designs been compared for slide & core-pull material?
|
|
G. INSERTS
|
CKD
|
|
1.
How many inserts?
|
|
|
2.
Are inserts burned or cut?
|
|
|
3.
ONLY if cut, is insert tapered 3-5 deg?
|
|
|
4a. ONLY
if cut, are pocket covers surfaced and on the correct layers?
|
|
|
4b. ONLY
if cut, are all fillets correct size?
|
|
|
4c. ONLY
if cut, are inserts written out as individual files?
|
|
|
4d. Is
the insert cleared correctly for spotting?
|
|
|
5.
Are the layers all correct?
|
|
|
6.
Do inserts & labels match design file?
|
|
|
7.
Are screws and dowels shown?
|
|
|
8.
Is edm required?
|
|
|
9.
Are block-ups complete with sizes and setups?
|
|
|
10. Are
screw locations required and incorporated into surface file?
|
|
|
11. Are
rib cuts required and complete?
|
|
|
12. Have
designs been compared for insert material?
|
|
H. SLEEVES
|
CKD |
|
1.
Are sleeves required?
|
|
|
2.
How many?
Are spares required?
|
|
|
3.
Are they standard Ø and lengths?
|
|
|
4.
Are carrier/extensions required to keep standard length?
|
|
|
5.
Has the sleeve been designed to achieve between .75”-2” ream on
ID? ¾”
for the OD?
|
|
|
6.
Have the sleeves been labeled and sections cut through all of them?
|
|
|
7.
Do the sections have depths of part from core surface and the ID
and OD dimensioned?
|
|
|
8.
Are sleeve assemblies ready to fabricate?
|
|
|
9.
If special size sleeves are required, are they ordered?
|
|
| |
|
I. CORE PINS (BLIND &
THROUGH)
|
CKD |
|
1. Are pins blind (press fit
from the front), or through (stationary core pin from the back)?
|
|
|
2. If pin are through pins,
are they keyed?
|
|
|
3. If so, how many?
|
|
|
4. What is the purpose?
|
|
|
5. Are pins shown complete?
|
|
|
6. Are pins dimensioned at
part area to show depths, ø, and draft?
|
|
|
7. Are pins labeled in
Planviews & Sections?
|
|
|
|
J. CORE PULLS
|
CKD
|
|
1.
Are core pulls required?
|
|
|
2. Hydraulic or mechanical?
|
|
|
3.
How many are required?
|
|
|
4.
Are sections cut through all core pulls (and labeled)?
|
|
|
5.
If hydraulic, is design complete:
|
|
|
a. Is cylinder
mounting shown?
|
|
|
b. Is standard
pin carrier used?
|
|
|
c. Have cylinder orders been written, checked, and given to
purchasing?
|
|
|
d. Is pin
carrier keyed and retained?
|
|
|
6.
Is pin carrier spring loaded?
|
|
|
7.
Is part feature formed by pin dimensioned with tolerance?
|
|
|
8.
Are core pull assemblies ready to fabricate?
|
|
K. WATER SPECIFICATIONS AND
REQUIREMENTS
|
CKD |
|
1.
Have the customer’s specs been reviewed?
Incorporated?
|
|
|
Line Ø |
| Bubbler
size ø (Standard std. 1 size larger than water line
ø)
|
|
|
Fitting type (Main connections)
| Counterbores
|
|
|
|
Circuit layout (i.e. flood, forced)
| Mainforld
or Valves |
| Hose color or type
|
|
|
|
|
L. WATER DESIGNS
|
CKD |
|
1.
Are sections cut through all lines and labeled X or Y value?
|
|
|
2. Are
any coolant lines taped into core steels?
|
|
|
3.
Are all lines labeled in Plan Views with PL heights?
|
|
|
4.
Do all sections match PL labels?
|
|
|
5.
Are all in’s, ou’ts, and loops labeled?
|
|
|
6. Are flow arrows or layout
sheets required to help follow flow (i.e. complex bumper)?
|
|
|
7. Water line spacing
suitable for part and mold size?
|
|
|
Small
2-3” Medium 3-4”
Large 3-5” Prototype
|
|
|
8. Bubblers, spacing same as
WL spacing?
|
|
|
|
|
M. EJECTION
|
CKD
|
|
1.
Are ejector pins std. Ø and lengths?
|
|
|
2. Are ejector pins Ø’s
the maximum the part allows without having more than 3 sizes?
|
|
|
3.
Are pins near all ribs and bosses (2 per feature as close to ribs
as possible)? (.060)
|
|
|
4.
Are all pins pushing on best possible areas?
(Rads, walls, etc.)
|
|
|
5.
Has ejector pin program been run to verify pins are pushing in best
location?
|
|
|
6.
Is proper/standard ream shown ¾” standard for injection molds?
|
|
|
7.
Is proper/standard ½” ream shown with .06 dia. clearance for
compression molds?
|
|
|
8.
Is proper ream shown for gate and runner pins and special
(non-std.) ream noted?
|
|
|
9.
Are ring pins required?
Are they called out in P.V.?
Is there a blow-up view?
|
|
|
10. Are
return pins shown complete with clearance for screw if applicable?
|
|
|
11. Are
return pin springs required?
If yes, are they shown?
|
|
|
|
|
N.
HYDRAULIC EJECTION
|
CKD |
|
1.
Is hydraulic ejection required?
|
|
|
2.
Are cylinders shown complete & designed to customer
specifications?
|
|
|
A. Dowels?
B. Retainer Key?
C. Mounting Plate?
D. H-Nut?
|
|
|
E. Have cylinders been
ordered?
|
|
|
3.
Is hydraulic routing through rails?
If yes, is it shown?
|
|
|
4. Are rest buttons located
directly next to hydraulic cylinders?
|
|
|
5.
Are limit switches shown & protected?
|
|
|
|
|
O. MISCELLANEOUS
|
|
|
1.
Are standoffs required/shown?
|
|
|
2.
Are safety straps shown?
|
|
|
3.
Has all plate work been written up, checked, and given to
purchasing department?
|
|
P.
EJECTOR BOX
|
CKD |
|
1.
Knock outs work for customer’s press?
|
|
|
2.
Knock outs work for tryout press?
|
|
|
3.
Knock out clearance size 2.25 Ø clearance or 1.25 Ø clearance?
|
|
|
4.
Knock out threads called out?
|
|
|
5.
Rest buttons designed to Standard std?
|
|
|
6. Rest button under return
pins and sprue pins?
|
|
|
7.
Rest buttons 6-8” apart on small molds and 8-10” apart on large
molds?
|
|
|
8.
Are ejector screws required for pin plate?
|
|
|
9.
Is .50 Ø jack screw shown on or near CL?
|
|
|
10. Are
.50 Ø dowels shown on CL?
|
|
|
11. Are
forward stops required? If
yes,
|
|
|
Is there only 4?
|
|
|
Are they near K.O. and hydraulic ejection cylinders?
|
|
|
12. Are
they support designed?
|
|
|
13. Do
support have ½” Ø socket head cap screw?
|
|
|
14. Is
the ejector guide pin assembly to Standards?
|
|
|
Is the ejector guide pin assembly design complete?
|
|
|
15. Are
handling holes shown & the same size if possible in all of the
following components?
|
|
|
a. Top of
ejector plate?
|
|
|
b. Top or
retainer plate?
|
|
|
c. Top of clamp
plate (over 60” also in ends)?
|
|
|
d. Ends of rails?
|
|
|
16. If
quick kickers are required, are they designed?
|
|
|
17. Is
there clearance for lifter rod access?
|
|
|
18.
Are bolt holes required? If
so, is design complete?
|
|
|
A.
EJECTOR BOX & CAM MACHINING (Continued)
|
CKD |
|
19. Does
clamp plate require valve gate manifold accommodations?
|
|
|
a. Pockets for
valve gate cylinders?
|
|
|
b. Channels for
valve gate plumbing?
|
|
|
c. Is water
required in clamp plate for valve gate cooling?
|
|
|
20. Is
standard H-Nut used for hydraulic ejection?
|
|
|
21.
Is all hydraulic plumbing shown?
|
|
|
a. Main ins and outs.
(Type? Location?)
|
|
|
b. Are flow
dividers required?
|
|
|
22. Is
manifold electrical designed to customer specs?
|
|
|
23. Are
plaques and schematics required? If
yes, are they designed?
|
|
|
a. Water?
|
|
|
b. Hydraulics?
|
|
|
c. Electrical?
|
|
|
d. I.D. tab? (ALWAYS REQUIRED)
|
|
|
e. Any special
purpose plaques?
|
|
|
24. Is
stock list and purchase list complete?
|
|
|
25. Have
the final prints been sent to the customer?
|
|
|
26. Has
the customer approved the designs?
|
|
|