CDTD 130
Tool Detailing

Project One

Detailing a Frisbee Injection Mold

All drawings must be plotted to the specified Scale

Assignment 1  Completed No later than  Jan 20th

          Draw the Ejector Housing

          If time permits, start the PRELIMINARY  Detail Dimensions

Assignment 2  Completed No later than  Jan 22

          Draw the Ejector Plate

          If time permits, start the PRELIMINARY  Detail Dimensions

Assignment 3  Completed No later than  Jan 26

          Draw the TCP (Top Clamp Plate)

          If time permits, start the PRELIMINARY  Detail Dimensions

Assignment   4   Completed No later than  Jan 29Only ONE size ejector pin

          Draw the Ejector Pin, Return Pin, Stop Pin, Guide Pin, and Guide Bushing

          If time permits, start the PRELIMINARY  Detail Dimensions

Assignment   5  Completed No later than  Feb 5

          Draw the  Sprue Bushing, Locating Ring, Top Clamp Plate (1.5 thk)

          If time permits, start the PRELIMINARY  Detail Dimensions

Assignment   6  Completed No later than  Feb 12

          Draw the  A Retainer Plate

          If time permits, start the PRELIMINARY  Detail Dimensions

Assignment   7  Completed No later than  Feb 19

          Draw the  B Retainer Plate 1.38 thk

          If time permits, start the PRELIMINARY  Detail Dimensions

Assignment   8  Completed No later than  Feb 26

          Draw the  Support plate  1.12 thk

          If time permits, start the PRELIMINARY  Detail Dimensions

Assignment   9  Completed No later than  Mar 4

           Draw Part (SOLID), A [cavity] and B [core] Cavity Steels

If time permits, start the PRELIMINARY  Detail Dimensions